Permits and protection zones on the chalk
Most small household plants can run under the General Binding Rules without a permit. The main exception is a newer discharge to ground inside source protection zone 1, the area closest to a public water supply borehole, which normally needs a permit from the Environment Agency.
Whether or not that applies to you, the rules still expect the plant to be maintained as the manufacturer says, with sludge removed by a registered waste carrier. We leave a written record after each visit, and we can look after your control panel too if it’s showing faults.
Learn more